Calling a roof restoration company in Perth might be necessary if you’ve noticed visible damage to your home’s roof or if you have lots of leaks. You may even be reluctant to have your home’s roof restored because of the perceived inconvenience of having contractors on-site.
To set your mind at ease, we thought it would be a good idea to take a look at how long a roof restoration project might take on an average residential home in Perth.
Here are the major factors that might influence a restoration project’s timeline:
Size and Complexity
The size of the roof and its architectural complexity are key factors in determining how long a roof restoration project will take.
Large roofs will take longer than small roofs, simply because there’s more ground to cover.
Also, complex architectural features such as steep slopes, multiple gables, chimneys and other protrusions could further complicate the task.
Generally speaking, a small and simple roof can take anywhere between one and three days, while large and complex roofs can take up to a week. Extremely large homes could take even longer.
The more intricate the roof and the larger it is, the more materials are required, and the more detailed the planning needs to be. Complex roofs require extra care during cleaning, repairs and coating, which elongates the timeline.
Extent of Repairs Needed
Roofs that are in extremely poor condition with extensive damage will require more work and therefore take longer than those that only require a basic cleaning and resealing, for instance.
For minor repairs, you’re generally looking at somewhere in the region of one to two days. If there is major structural work required to get the roof back into prime condition, it can take anywhere from three days to a week or longer.
Replacing lots of damaged tiles, fixing structural components, or addressing widespread water damage are each components of a restoration that can affect the timeline of the project.
Weather
Although Perth’s climate is relatively moderate, poor weather conditions can exacerbate the restoration schedule.
Clear weather is best for roof restoration and can make tasks like cleaning, sealing, or painting proceed much quicker. During dry or mild seasons, the work generally tends to stay on schedule without delays.
However, rain and extreme heat can delay the project. Curing times for coatings can be extended during periods of high humidity or rain, which can outright halt the work to avoid water damage. Poor weather conditions can also cause improper material adhesion, further complicating the process.